Thread: U.K. Seen Doubling Power Price To Guarantee New Reactor: Energy

  1. #1

    Default U.K. Seen Doubling Power Price To Guarantee New Reactor: Energy

    The future of the U.K.’s nuclear industry will be decided on one number: the price the government’s willing to guarantee Electricite de France SA will get for generating atomic power.EDF and government officials will negotiate the so-called strike price for new nuclear power plants by the end of the year. To ensure the Paris-based utility makes a final decision on a new reactor in southwest England, the U.K. must set a price between 95 pounds ($148) and 105 pounds a megawatt-hour in 2020, double the level power trades at today, according to Bloomberg.

    Britain, trying to replace aging plants and cut carbon dioxide emissions, is one of just three western European countries still pursuing plans for new nuclear stations following the Fukushima disaster last year. Safety enhancements have contributed to rising nuclear costs, leading to concern U.K. consumers may pay too much for new reactors.
    “Discussions are happening in smoke-filled rooms, over champagne and croissants, to establish a price that we will all pay,” said Ian Marchant, chief executive officer of the U.K.’s second-largest energy supplier SSE Plc (SSE), which dropped plans to develop reactors in September. “There is no transparency as to what that price will be.”
    I am not in any way anti nuclear but doubling the strike price just to cover the so far intangible cost of these reactors is taking the piss.



    http://www.bloomberg.com/news/2012-0...or-energy.html



  2. #2
    Senior Member Mackie's Avatar
    Join Date
    Jan 2008
    Location
    Stuttgart
    Posts
    5,915

    Default

    Can't wait for it. Cameron will build it whatever it costs. It would be a major loss for him and his policies.
    My bets are on massive cost overruns later because of a very bad contract. And later he will blame the French.
    The second option is a nuclear power plant from China.

  3. #3
    Senior Member Lov3ll's Avatar
    Join Date
    Sep 2006
    Location
    Yorkshire, UK
    Posts
    2,770

    Default

    China is already building 2 EPRs on time and on budget and is now ahead of the French EPRs which are all overrun and overbudget.

    Another essential ingredient is Chinese labour; there are 9,000 workers currently on site. Instead of working three eight-hour shifts, as is common in Europe, the people working for Hua Xing, the concrete contractor on the first Taishan reactor, work 10-hour stints, seven days a week.

  4. #4
    Senior Member Mackie's Avatar
    Join Date
    Jan 2008
    Location
    Stuttgart
    Posts
    5,915

    Default

    Quote Originally Posted by Lov3ll View Post
    China is already building 2 EPRs on time and on budget and is now ahead of the French EPRs which are all overrun and overbudget.
    In China with French Technology. Highly doubt this will work here.

  5. #5
    Senior Member EdisonTrent's Avatar
    Join Date
    Oct 2011
    Posts
    2,400

    Default

    Quote Originally Posted by Lov3ll View Post
    China is already building 2 EPRs on time and on budget and is now ahead of the French EPRs which are all overrun and overbudget.
    Lets hope fatigue doesn't make a mess of things.

  6. #6
    Makes me fart lots wagon's Avatar
    Join Date
    Mar 2008
    Location
    Hocus Pocus Diplodocus the Psychic Dinosaur
    Age
    36
    Posts
    10,278

    Default

    The domestic price here in Queensland, Australia is 22cents/kWH; $220/MWH which is about 144 pounds/MWh. (and that's kind of cheap for a lot of Australia) Suck it up, UK!
    Last edited by wagon; 07-15-2012 at 06:17 AM.

  7. #7
    Warmonger Nacho-Libre's Avatar
    Join Date
    Sep 2008
    Location
    UK
    Age
    25
    Posts
    942

    Default

    Quote Originally Posted by wagon View Post
    The domestic price here in Queensland, Australia is 22cents/kWH; $220/MWH which is about 144 pounds/MWh. (and that's kind of cheap for a lot of Australia) Suck it up, UK!
    Yes, but the UK is no-where NEAR the size of Australia.

  8. #8
    Makes me fart lots wagon's Avatar
    Join Date
    Mar 2008
    Location
    Hocus Pocus Diplodocus the Psychic Dinosaur
    Age
    36
    Posts
    10,278

    Default

    Quote Originally Posted by Nacho-Libre View Post
    Yes, but the UK is no-where NEAR the size of Australia.
    The generation costs would be similar, but the distribution costs here would be higher, yes.

  9. #9
    Senior Member Bleifuss's Avatar
    Join Date
    Jul 2008
    Location
    Na terra de cartafoles de leituga
    Age
    41
    Posts
    2,540

    Default

    Quote Originally Posted by wagon View Post
    The generation costs would be similar, but the distribution costs here would be higher, yes.
    I had another ranting moment the other day when they revealed that people with solar panels get 20cents per kw/h to feed it into the net
    but pig farmers or landfills who generate power through methane get only 3cents.

  10. #10
    Makes me fart lots wagon's Avatar
    Join Date
    Mar 2008
    Location
    Hocus Pocus Diplodocus the Psychic Dinosaur
    Age
    36
    Posts
    10,278

    Default

    Quote Originally Posted by Bleifuss View Post
    I had another ranting moment the other day when they revealed that people with solar panels get 20cents per kw/h to feed it into the net
    but pig farmers or landfills who generate power through methane get only 3cents.
    I'm glad the feed-in tariff has had the guts cut of of it since we are all paying for that... and what about the subsidised solar panels themselves? Geez.............

  11. #11
    Senior Member Bleifuss's Avatar
    Join Date
    Jul 2008
    Location
    Na terra de cartafoles de leituga
    Age
    41
    Posts
    2,540

    Default

    Quote Originally Posted by wagon View Post
    I'm glad the feed-in tariff has had the guts cut of of it since we are all paying for that... and what about the subsidised solar panels themselves? Geez.............
    Yeah the panels have to come down and the rest up a little.
    To convert the pigfarm to be self sufficient was about $1m , runs the farm , the house and most of the nearby properties just on methane.
    Need to invest some more $$ in stuff like that.

  12. #12
    Makes me fart lots wagon's Avatar
    Join Date
    Mar 2008
    Location
    Hocus Pocus Diplodocus the Psychic Dinosaur
    Age
    36
    Posts
    10,278

    Default

    Quote Originally Posted by Bleifuss View Post
    Yeah the panels have to come down and the rest up a little.
    To convert the pigfarm to be self sufficient was about $1m , runs the farm , the house and most of the nearby properties just on methane.
    Need to invest some more $$ in stuff like that.
    Methane is supposed to be a nastier 'greenhouse gas' too, so said pigfarm is really doing a good job. I wonder if they got the idea from Mad Max or Evil Aliens?

  13. #13
    Senior Member memfisa's Avatar
    Join Date
    Jul 2011
    Location
    600ft under the Canadian Shield
    Posts
    1,200

    Default

    Quote Originally Posted by Mackie View Post
    Can't wait for it. Cameron will build it whatever it costs. It would be a major loss for him and his policies.
    My bets are on massive cost overruns later because of a very bad contract. And later he will blame the French.
    The second option is a nuclear power plant from China.
    Or CANDU9 or ACR-1000
    Chinareactor would be neat tho...